[1]
Faroucki Seven Mahendra et al. 2023. Analysis of Maximum Allowable Operating Pressure on PT Tenggara Pipeline Network to Support Well Reactivation Plan. Jurnal Migasian. 7, 2 (Dec. 2023), 21–30. DOI:https://doi.org/10.36601/jm.v7i2.246.